Specialty Restoration
|
Here are some samples of OSR Systems’ unique ability to remove sediments from hard to reach places.
|
|
Cisterns and Pump Stations |
 |
|
 |
|
 |
|
 |
|
|
|
|
|
|
|
These three, massive, 48-inch pump stations deliver water from the reservoir to a river on the other side to prevent flooding.
|
|
OSR Systems easily removed 8 feet of sediment from this pump station.
|
|
Removing sediment from irrigation systems - a tight fit.
|
|
Removing sediment from the intake inlet and replacing intake screens in the reservoir.
|
|
 |
|
 |
|
 |
|
|
|
|
|
|
|
|
|
These plinking ponds on a gun range were full of lead shot. EPA and DNR insisted they be removed from the sediments.
|
|
Removed sediments from the pond while separating the shot from the sediments.
|
|
How we did this can not be shown. |
|
|
|
 |
|
 |
|
 |
|
 |
|
|
|
|
|
|
|
This 1.5 mile, Class-A trout stream received foreign sands and material from a failed construction project up-stream.
|
|
OSR System’s light and portable system was able to maneuver around dense heavy foliage.
Removed foreign spoils, sands, and leave the gravel for fish to spawn.
|
|
See Video: “Crystal Brook” |
|
Under large culverts - hands on to prevent digging up the road. |
|
|
|
Water Features / Waterfall Ponds - Q Center |
 |
|
 |
|
 |
|
 |
|
|
|
|
|
|
|
Sediment removal in sensitive areas and no damage to the liner. |
|
Easy in and out in pristine landscape areas
|
|
Very challenging |
|
See Video: “Q Center” |
|
|
|
Water Features / Waterfall Ponds - Historic Mill |
 |
|
 |
|
 |
|
 |
|
|
|
|
|
|
|
Historical Site: Mill was converted to the first electric power plant. Carefully removing sediments from water chase.
|
|
Chase by Chase. |
|
We were able to remove of two feet of mixed sediments.
|
|
We were also able to get down to the original rock bottom. |
|
|
|
Water Features / Waterfall Ponds - Fort Lauderdale Park |
 |
|
 |
|
 |
|
 |
|
|
|
|
|
|
|
Fort Lauderdale Park, 800’ x 10’ channel was impassible for canoes after hurricane Erma deposited 4 feet of material. Researching contractors, OSR Systems was the only company who submitted a bid.
|
|
The 4 foot plus thick sediment mass removed. |
|
Sediments removed down to a sand bottom. |
|
Easily passable. Park District was very impressed. |
|
|
 |